HOME > EXPERIENCE > CLP Engineering Ltd. / Hong Kong Airport Authority - Enhancement Works for Chilled Water System - Installation of VFD and Modification of Star/Delta starter in Motor Control Centre (MCC) at Skypier and North Satellite Concourse (NSC)
Job Name
CLP Engineering Ltd. / Hong Kong Airport Authority - Enhancement Works for Chilled Water System - Installation of VFD and Modification of Star/Delta starter in Motor Control Centre (MCC) at Skypier and North Satellite Concourse (NSC)
Completion date
31/09/2014 - Factory Acceptance Test for Harmonic Filter Panels at Workshop ; 03/11/2014 - Satisfactory Acceptance Test / T&C for all installation works
Job Details

CSI is responsible for Supply and Install of VSD c/w harmonic filter panels with modification of motor starter centre for :

  • North Satellite Concourse (NSC)
  • Skypier

The scope of works included :

  • Designed, supplied, installed and T&C the Danfoss 37kW, IP55 VSD and IP00 harmonic filter with enclosure.
  • Designed, supplied, installed and T&C the Danfoss 18.5kW, IP55 VSD and IP00 harmonic filter with enclosure.
  • Designed, supplied, installed and T&C the existing MCC Star/Delta starter c/w selector switches, control relays and control cables.

Again, CSI provided all round solution to our client, CLP Engineering - airport facilities management division.

"This project requires a Contractor with detailed mind-set and skillful technique in order to carry out the works with zero interruption to airport operation. CSI is the company which is able to handle it confidently."

Airport Authority, "It is easy to distinguish the works done by CSI, awesome workmanship."