EXPERIENCE
HOME > EXPERIENCE > Shinryo (Hong Kong) Ltd. / EMSD - District Cooling System at Kai Tak Development Phase IIIA Package
Job Name
Shinryo (Hong Kong) Ltd. / EMSD - District Cooling System at Kai Tak Development Phase IIIA Package
Completion date
08/2014 - 12/2015
Job Details

CSI is responsible for Supply and Install of Electrical and PLC System Installation for :

  • Northern DCS Plant
  • Southern DCS Plant
  • Seawater Pumping Station
  • 5 nos. Sub-stations

The scope of works included:

  • Electrical Power and Control Cables Installations for Chilled Water Pumps, Condensing Pumps, Ventilation Fans, AHUs and FCU etc.
  • Designed, supplied, installed and T&C the LMCPs for Mitsubishi VSD c/w Harmonic Filter of largest rating 450KW.
  • Designed, supplied, installed and T&C the LV Busducts of rating 2500A & 3200A between Transformers and LV Switchboards.
  • Supplied, installed and T&C Lighting Installation.
  • Supplied, installed and T&C Air Side and Water side control equipment such as dampers, valves, pressure sensors and temperature sensors etc.
  • Supplied, installed and T&C the VAC Trip for AHUs, FCUs and Fans.
  • Designed, supplied installed and T&C Siemens PLC Control System and integration with existing system.

Again, CSI provided "One Stop Services" to our client, Shinryo for the LV Electrical and Control portion.

The project requires a Contractor able to provide all skills and knowledge. CSI is the company that is switched on.