EXPERIENCE
HOME > EXPERIENCE > Shinryo ( Hong Kong ) Limited - Proposed Commercial Development on K.T.I.L. 482, No.49 King Yip Street MVAC Electrical Installation
Job Name
Shinryo ( Hong Kong ) Limited - Proposed Commercial Development on K.T.I.L. 482, No.49 King Yip Street MVAC Electrical Installation
Completion date
30/03/2013
Job Details

CSI designed, supplied and installed the Remote Control Panels (located at the Control Room) for control and monitor the FCUs, AHUs, Carpark Exhaust Fans and Chiller Plant etc. The backbone of I/Os communication was through Carlo Gavazzi Dupline which only consisted of 2 x 1.5mmsq. 1/C cable and the transmitting distance could be up to 10km !

The main advantage of using Dupline compared with traditional practice was loads of control cables connecting among the field equipment and Remote Control Panels could be totally eliminated. In addition, extra equipment could be connected to existing backbone in future to cater for necessary expansion without installing extra cables.

The installation was found reliable and well proven.

Our Partners